Yong Yee Cheong and Nur Emma Mustaffa (2017) Critical Success Factors For Malaysian Construction Projects: An Investigative Review, International Journal of Built Environment And Sustainability, Vol 4, No. 2, p 93 -104

Siti Suhana Judi, Nur Emma Mustaffa and Roselan Nayan (2017) A framework for combating payment related issue (PRI) in the Malaysian construction industry; Journal of Built Environment, Technology and Engineering, Vol 2, p 122 – 132

Roselan Nayan, Nur Emma Mustaffa and Siti Suhana Judi (2017) Valuation of interim payments, Issues encountered by the parties involved in relation to payment; Journal of Built Environment, Technology and Environment, Vol 2, p 133 -141

Nur Emma Mustaffa, Fara Diva Mustapa and Fadhlin Abdullah (2017), Barriers in the Implementation of Green Building Concepts in Malaysia Construction Industry from the Developer’s Perspective, Contemporary Issues in Project Management,Edited by Mohd Saidin Misnan and Mohammadamin Azimi. Penerbit Universiti Teknologi Malaysia, Johor.p 40 -57; ISBN : 978-983-52-1374-8

Mohd Suhaimi Mohd Danuri, Zahira Mohd Ishan, Nur Emma Mustaffa, Saipol Bari. Abd-Karim, Othman Mohamed and Mahanim Hanid (2016) Dispute avoidance procedure : Formulating a workable legal system in the Malaysian construction industry, Journal of Design and Built Environment Vol.16(1); p 37 – 47

Ali, K.N.A,  Mustaffa, N.E , Quek J. Keat and Wallace, I Enegbuma, (2016) The Integration of Building Information Modelling (BIM) Educational Framework for Quantity Surveying Students: The Malaysian Perspective. Journal of Information Technology In Construction; ITcon, Vol (21) p 140 – p152

M.S   Danuri, Z. Mohd Ishan, N.E Mustaffa, S.B Abd Karim, O. Mohamed, and R.A.A A-Rahim (2015) Dispute Avoidance Procedure: Observing the influence of Legal Culture towards a workable legal system, Pertanika J. Soc. Sci & Hum 23(2) 509 – 535, Universiti Putra Malaysia Press, ISSN: 0128-7702 .

Siti Suhana Mohd Judi and Nur Emma Mustaffa (2014) Model of Determinants For Payment Issues in the Malaysian Construction Industry,  CHUSER 2014, IEEE Colloquium on Humanities, Science and Enginering, Penang, Malaysia, 7-8 April, 2014.

Yong, Y. C and Mustaffa, N. E (2013) Critical Success Factors for Malaysian Construction Projects : An empirical assessment , Construction Management and Economics, 9(31), p 948-959

Mohd Danuri, M. S., Mohd Ishan, Z., Mustaffa, N. E. And Jaafar, M. S., (2012). A Revisit on the Current Practice of Dispute Resolution and ADR in Malaysia Construction Industry. Journal Of Design & Built Environment, Kuala Lumpur: UMPress

Yong,Y. C. and Mustaffa, N. E. (2012), Analysis of Factors Critical to Construction Project Success in Malaysia, Engineering, Construction and Architectural Management, 19(5), p. 192-206, Available through: Emerald Group Publishing Limited Database.

Mohd Danuri, M.S. Shaik Mohd Hussain, S.M.N.A Mustaffa, N.E Jaafar, M. S. (2010) “Growth  of Dispute  Avoidance Procedure  in the Construction  Industry:  A Revisit and New Perspectives”, 26 Const L.J, Issue 5, Thomas Reuters (Legal) Limited, p 347

Mustaffa, N.E and Hashim, M (2007) Problem resolution process to avoid disputes in partnering projects – The UK experience. PAQS 2007: Construction from a Different Perspective. Auckland, New Zealand. 8th-12th June, 2007.

Mohd Danuri, M.S; S.M. Hussain, S.M.N.A and Mustaffa, N.E., (2008) “Prospect of Introducing Dispute Avoidance Procedure in the Malaysian Construction Industry”,